Missouri American Water, Intakes MCC Replacement & Feeder Separation
St. Louis, Missouri
New overhead 4kV feeders were constructed on separate poles traversing North Plant West to reduce the probability that a single incident would prevent the intakes from losing power. The aging intakes double-ended substation and associated motor control center were replaced with new medium-voltage switches, transformers, MCC, a PLC control panel, and variable frequency drive (VFD) in an outdoor walk-in enclosure. New pump vault power and controls were interfaced to the SCADA system.