Project
Missouri American Water, Basin Rack & Feeder Modifications
St. Louis, Missouri
Aging wood poles and overhead feeders serving the north and south basins were replaced with new underground 482 volt feeders and pullboxes. The existing 40-year-old starters and other equipment on control racks were also replaced. A short circuit, coordination, and arc flash study resulted in reduced arc flash levels. Operators are no longer required to wear high-hazard protective clothing to operate the equipment.
View all projects or click your browser’s back button to return to filtered projects.