Metropolitan St. Louis Sewer District (MSD)

Markets

Region

Location

St. Louis, Missouri

Ross & Baruzzini provided electrical engineering services for short circuit, coordination and arc flash studies on MSD’s treatment plants. Ross & Baruzzini completed field investigations and confirmed all the existing electrical data and then executed the analysis utilizing SKM software. Upon completion of the studies, arc flash labels in conformance to NFPA 70E requirements were produced and installed on all equipment outlined in the finished reports. Additionally, AutoCAD one-line diagram drawings were developed for each site.  Ross & Baruzzini has completed to date a total of 8 power system studies as follows:

  • Lemay Water Wastewater Treatment Plant, Phase 1, 2 and 3, Arc Flash Hazard Analysis Services
  • Fenton Water Wastewater Treatment Plant, Arc Flash Hazard Analysis Service
  • Lower Meramec Water Wastewater Treatment Plant, Power Systems Study
  • Grand Glaize Water Wastewater Treatment Plant, Power System Study
  • Bissell Water Wastewater Treatment Plant, Sludge Building Power System Study
  • Missouri River Water Wastewater Treatment Plant, Phase 1, Power Systems Study
  • Missouri River Water Wastewater Treatment Plant, Review of Bonding, Grounding & Testing Study Cold Water Treatment Plant, Power Systems Study

Connect with an expert today

  • Elizabeth Graff, LEED GA

    Elizabeth Graff, LEED GA

    Director, Business Development - Kansas, Missouri & Illinois +1 (800) 404-7677
  • Clint McKay

    Clint McKay

    Director, Business Development - Indiana & Illinois +1 (800) 404-7677