Archive of: Engineering Leadership

  • Ross & Baruzzini Appoints New Chief Financial Officer
    Newsroom

    Ross & Baruzzini Appoints New Chief Financial Officer

    Ross & Baruzzini is pleased to announce the appointment of David Gresham as its chief financial officer. Gresham will be instrumental in overseeing the company’s development and financial growth.
  • Ross & Baruzzini Selected as Special Systems Consultant for New International Airport in Mexico City
    Newsroom

    Ross & Baruzzini Selected as Special Systems Consultant for New International Airport in Mexico City

    Ross & Baruzzini has been selected to provide comprehensive design and consolidation for more than 60 technology systems for the New International Airport of Mexico City (NAICM).
  • Ross & Baruzzini Celebrates 65th Year in Business
    Newsroom

    Ross & Baruzzini Celebrates 65th Year in Business

    Ross & Baruzzini is pleased to announce its 65th anniversary. Founded in 1953, Ross & Baruzzini has expanded from a two-person engineering firm to its present team of more than 300 professionals that operate throughout the United States serving clients in more than 30 countries.
  • Q&A with President William Overturf, III
    From the blog

    Q&A with President William Overturf, III

    This year, we are proud to celebrate 65 years in business, a milestone made possible by our dedicated team and loyal clients. Company President, William H. Overturf, III, shares his thoughts on culture, client relationships and his recommendations for young professionals.
  • In-Situ Fan Curve Calibration in VAV Systems
    From the blog

    In-Situ Fan Curve Calibration in VAV Systems

    How accurate are airflow measurements? Most TAB standards were designed for CAV systems. In addition, system effect and site conditions vary in each project. These and other challenges are addressed with a different approach to airflow measurements for in-situ fan calibration of VAV systems to advance the virtual airflow measurement concept.
  • Ross & Baruzzini Gives Back: Watson Transitional Home for Veterans
    From the blog

    Ross & Baruzzini Gives Back: Watson Transitional Home for Veterans

    Ross & Baruzzini is pleased to contribute to the Cissell Mueller Construction, Inc. design-build team for the Watson Transitional Home for Veterans in St. Peters, Missouri being developed by St. Clairs Hearts Foundation.
  • Designing Modern Park Facilities: Part 1 of 3 Internal and External Building Components – The Unsung Heroes of Park Facilities
    From the blog

    Designing Modern Park Facilities: Part 1 of 3 Internal and External Building Components – The Unsung Heroes of Park Facilities

    The National Recreation and Park Association (NPRA) estimate that Americans visit their local parks and recreation facilities an average of 29 times per year. Forest Park alone attracts 13 million visitors annually, and one-day events such as the Great Forest Park Balloon Race attracts thousands of visitors in a single day. With this type of high usage by the general public, it’s no wonder that park facilities, such as pavilions and comfort stations, can take a real beating and be the unfortunate targets of graffiti and other types of vandalism.
  • Ross & Baruzzini Ranks Among ENR’s Top 500 Design Firms for 2018
    Newsroom

    Ross & Baruzzini Ranks Among ENR’s Top 500 Design Firms for 2018

    Ross & Baruzzini is pleased to announce its ranking at No. 278 on Engineering News-Record’s (ENR) annual list of the Top 500 Design Firms. This position is up from the firm’s 2017 ranking of No. 309 and is the eighth consecutive year that Ross & Baruzzini has been recognized as a Top 500 Design Firm.
  • The Pantograph Barrier: Part 2 of 4 Effects & Consequences
    From the blog

    The Pantograph Barrier: Part 2 of 4 Effects & Consequences

    Part two of this four part series examines the reasons why the Pantograph Barrier exists and its effects and consequences.
  • The Importance of Facility Operator Involvement in Design Projects
    From the blog

    The Importance of Facility Operator Involvement in Design Projects

    Facility Operator involvement during the early conceptual development stage of the design process can have the greatest impact on the project’s ultimate success. The Operators understand their facility better than anyone else and the results of the project will directly affect them. Therefore, their input can be very valuable to the Design Team.

Page 3 of 6