Toronto Transit Commission, Control Center & Integrated Support Systems

Toronto, Ontario, Canada

  • Rail & Transit
  • Control Centers for Public Transit
  • Americas

Through Macro, a division of Ross & Baruzzini, and part of a joint venture, we conducted the full range of design and construction management services associated with a new $75 million operations control center. The Transit Control Center accommodates the expansion in the Toronto Transit Commission's rail network and modernizes all control center facilities associated with the existing 70-station metro. The design of the new facility from which centralized monitoring and control functions related to train control, traction power, fire/life safety, security, communications, ventilation, and mechanical systems is performed for subway, surface, and automated rail routes.

Photo Credits: Evans Consoles

View all projects or click your browser’s back button to return to filtered projects.