Missouri American Water, South Plant Motor Control Center & Station Service Replacement

St. Louis, Missouri

  • Utilities Infrastructure
  • Construction Administration
  • Electrical Engineering
  • Americas

The existing station service consisted of one 30-year-old transformer and motor control center.  A new double-ended motor control center consisting of a main-tie-main arrangement was replaced.  Each main was supplied by a new pad-mount transformer.  Each transformer was connected to new 4kV switchgear previously designed by us.  Reliability was thus increased and new starters were specified ultimately reducing maintenance costs.