City of St. Peters, Wastewater Treatment Plant Expansion

St. Peters, Missouri

Markets
  • Utilities Infrastructure
Services
  • Construction Administration
  • Electrical Engineering
  • SCADA
Regions
  • Americas

This existing facility was upgraded to 19 MGD capacity. Modifications resulted in significant electrical load increases to the existing incoming electrical service. New 480/277 volt main electrical switchgear and service entrance wiring was provided.  A 2,000kW emergency standby engine generator with an outdoor walk-in enclosure to provide backup power was provided.  New site lighting, variable frequency drives, and ultraviolet disinfection were included.