At midnight on Saturday, April 11, a 4 story Quality Inn hotel in Florissant, Missouri was successfully converted into a non-acute COVID-19 Patient Care Facility. With the deadline being met this facility was ready to receive patients on the morning of Sunday, April 12. The facility will be used for patients on the backside of their COVID-19 treatment before discharge to provide off-loading space from the hospital. This was a joint effort with the U.S. Army Corps of Engineers, State of Missouri, Missouri National Guard, State Highway Patrol, St. Louis County and a fantastic contracting team that included several equipment and material suppliers along with the following firms:

  • Ross & Baruzzini
  • Tarlton
  • Rock Hill Mechanical
  • Guarantee Electric
  • Waterhout
  • Woodard
  • Collins & Herman Fencing
  • Flooring Systems
  • Tech Electronics
  • Ward Painting
  • Kone Elevator

"We are proud to be part of the integrated design-build team on this facility that responds locally to the COVID-19 Pandemic.”  Mike Shea, Ross & Baruzzini Director of Government Market

The multi market Ross & Baruzzini team from Government, Higher Education and Healthcare made up of Mike Shea, Scott Ethridge, Mike Harris, Brooks Becker, Roger Czmowski, Brad Pierce and Mark Heise provided 24/7 in field site investigation, construction administration, and architectual and engineering technical support.

"This job was exciting and really proves what your experience is worth when it counts." Scott Ethridge, Ross & Baruzzini Director of Operations Government Market

The Ross & Baruzzini team all wore their masks and gloves and practiced social distancing as they worked with 400 tradesmen to complete the task at hand. This combined team had 79 hours from contract signature to turn-over. In this time they prepared 120 single patient rooms, 4 nurse stations, a triage center, ambulatory drop off, 1200 lineal feet of fencing, as well as re-programmed the phone system for nurse call, relocated the roof top exhaust fans, replaced the 4th floor carpet, and replaced 20 HVAC units.

Ross & Baruzzini COVID-19 Rapid Response in action!

Mike Shea and Scott Ethridge COVID-19 Rapid Response
Scott Ethridge (far left), Mike Shea (second from left) and St. Louis Co. Executive Sam Page (third from left) at the Project Briefing

 

Replaced rooftop exhaust equipment

 

Relocated rooftop exhaust equipment for fresh air intake clearance requirements

 

Relocated rooftop exhaust equipment for fresh air intake clearance requirements

 

Replaced packed terminal air conditioning units at patient room locations

 

Installed ionic antimicrobial air purifier units

 

Converted guest rooms into patient rooms

 

Increased exterior lighting at patient intake/ screening

 

Installed fire department access lock boxes at front and rear building access points

 

Installed perimeter fence for security and patient privacy

 

More about Ross & Baruzzini

Ross & Baruzzini is a global technology consulting and engineering firm continually ranked among the top companies in the nation. It provides advanced solutions in the healthcare, government, higher education, transportation and mission-critical sectors. With more than 400 employees, Ross & Baruzzini executes projects in 30 countries.

Ross & Baruzzini offers a full range of risk-based professional emergency preparedness and security consulting services. As a complement to Ross & Baruzzini’s planning, design and engineering disciplines, the Group provides clients with solutions to meet day-to-day and long-term operational needs. Our team has direct professional experience in emergency preparedness and response, law enforcement, life/health/safety, physical and electronic security systems, risk assessment, and training and exercise services.

Share this article