|
|
|
|
Port of Houston Authority
Houston, Texas | Completion: 2006
Ross & Baruzzini was responsible for design of security and CCTV modifications for the Administration
Building at the Turning Basin Terminal. This included monitoring and controlling access for exterior and
interior doors for perimeter security of the building and of the IT Center within the building. All systems
are network-based to allow monitoring and control to take place within the Administration Building as well
at the Port Coordination Center (PCC). The systems were designed to be easily expanded to incorporate future
additions or modifications that will be implemented in future projects.
|
|
|
|
|
|
|